NEW PROJECTS

Willies RV - New Construction

Exterior work at Willies RV is looking great, with all finishes in place. Inside, walls are framed, painting has begun, and ceiling grids are hung. Toilet fixtures are being installed, and all of the exterior doors and windows are in place. 

Willies RV needed more space for sales, repairs, and offices, and this project aims to give them just that. By removing part of their existing building, we were able to expand and improve the areas that needed more space. The exterior finishes match the existing, so at a glance, it's not obvious that one is brand new, allowing for a blend of new and old. This new building adds a much bigger and more open sales floor, seven offices, lounge and break rooms, storage, and four service bays.

Crickets Pizza - Remodel & Addition

​​Exterior walls are in place and the roof is sheathed on Crickets Pizza. Interior demolition is done, interior framing is progressing.

 

Crickets Pizza began construction in spring of 2024. The existing building was originally a watch repair shop, and most recently a sweets & treats shop. It is now being renovated and expanded to become a pizza place located in the heart of Fall Creek. Featuring a play-place in the back and an apartment above, the restaurant aims to revitalize a historic building and provide a sense of community in this new family friendly pizzaria.

Zymurgy Brewing Pavilion - Addition

Work is nearing completion at Chippewa Valley Eye clinic. The exterior seamlessly matches the existing, and the interior finishes are almost complete, including paint, trim, doors, and cabinets, as well as plumbing and lighting fixtures. Equipment is already in place in exam rooms.

Zymurgy Brewing is adding a pavilion directlly adjacent to their existing building to provide additional shaded outdoor seating, and with an verhead door that opens into the pavilion, it makes for a nice integratin of both indoor and outdoor elements. The pavilion itself will have a solar panel roof, so while keeping customers shaded, the pavilion will also provide economical and ecological power for the existing building.

Crescent Meats - New Construction

Crecent Meats is nearly finished. Equipment is in place and ready for use and all finishes are complete. 

The new building at Crescent Meats includes all of the same production areas as their existing building - just bigger. With many coolers, prep, and loading areas, this building allowed them to significantly increase the rate and quantity of their production. We collaborated with CBS Squared by providing our structural design services, including foundation, footings, and roof framing. 

Eau Claire Event District - New Construction

Eau Claire Event District's Main Pavilion and High Country started construction in fall of 2022. We have gone out to document progress of these buildings through use of our Drone Photography Services.

Construction was completed in summer of 2023, and the Eau Claire Event District has already hosted Country Jam this year, as well as Reverb and weddings. See more information about the project on the Eau Claire Event District portfolio page.

The Cairn House - New Construction

Construction on the Cairn House is complete! Staff and residents alike are already occupying the building. Construction wrapped up in November of 2023. Check out the Cairn House portfolio page for more information.

VFW Post 305 - Remodel & Addition

Construction is complete on the VFW! VFW Post 305 started construction in May of 2023. This project included an addition to expand kitchen space and installing a new roof system for most of the building. Check out the VFW Post 305 portfolio page for more information.

Town of Washington - Addition

Construction on the Town of Washington is finished, just a couple months after it began at the end of April 2023.

This addition provides some much needed extra conference space to the existing building, which will also provide a larger space for voting. The new conference space is being added to the existing meeting room, allowing for almost twice the meeting space the building had previously. The scope of this project also includes a new asphalt parking lot and re-roofing portions of the existing building to ensure the longevity of the project.

Completed Projects

See some of our completed buildings in our portfolio - we'll be adding projects as they finish construction.